Chapter 25 - Crushers and Rockbreakers
Number Topic Rule of Thumb
25.01 Crusher Selection For a hard rock mine application below 600 tonnes/hour, select a jaw as the primary crusher.  Over 1,000 tph, select a gyratory crusher.  Between these capacities, you have a choice.  Source: Chris Ottergren
25.02 Crusher Selection For a hard rock mine application below 540 tonnes/hour, a jaw crusher is more economical.  Above 725 tonnes/hour, jaw crushers cannot compete with gyratory crushers at normal settings (6 -10 inches).  Source: Lewis, Cobourn and Bhappu
25.03 Crusher Selection For an underground hard rock mine, a gyratory crusher may be more economical in the case where its required daily production exceeds 8,000 tonnes of ore.  Source: Jack de la Vergne
25.04 Crusher Selection If the hourly tonnage to be crushed divided by the square of the required gape in inches is less than 0.115, use a jaw crusher; otherwise use a gyratory.  (If the required capacity in metric tph is less than 162 times the square of the gape in metres, use a jaw crusher.)  Source: Arthur Taggart
25.05 Crusher Selection Nearly all crushers produce a product that is 40% finer than one-half the crusher setting.  Source: Babu and Cook 
25.06 Crusher Selection The product of a jaw crusher will have a size distribution such that the -80% fraction size (d80) is slightly less than the open-side setting of the crusher.  For example, if the open-side setting is 6 inches, the d80 product size will be 5¾ inches.  Source: Unknown
25.07 Crusher Selection In a hard rock mine, the product from a jaw crusher will tend to be slabby, while the product from a gyratory crusher may tend to be blocky, the latter being easier to convey through transfer points on a conveyor system.  Source: Heinz Schober
25.08 Crusher Selection Impact crushers (rotary or hammer mills) have the capacity for high reduction ratios (up to 40:1), but are rarely applied to hard rock mines.  Since they depend on high velocities for crushing, wear is greater than for jaw or gyratory crushers.  Hence, they should not be used in hard rock mines that normally have ores containing more than 15% silica (or any ores that are abrasive).  Source: Barry Wills
25.09 Crusher Design The approximate capacity of a jaw crusher for hard rock application at a typical setting may be obtained by multiplying the width by 10 to get tonnes per hour.  For example, a 48 by 60 crusher will have a capacity in the order of 600 tph when crushing ore in a hard rock mine.  Source: Jack de la Vergne
25.10 Crusher Design The capacity of a jaw crusher selected for underground service should be sufficient to crush the daily requirement in 12 hours.  Source: Dejan Polak
25.11 Crusher Design For most applications, 7:1 is the maximum practical reduction factor (ratio) for a jaw crusher, but 6:1 represents better design practice.  Source: Jack de la Vergne
25.12 Crusher Design A well-designed jaw crusher installation has the lip of the chute overlapping the throat of the vibrating feeder by 400 mm (16 inches) to prevent spill resulting from the inevitable blowback of wayward fines.  Source: Jean Beliveau
25.13 Crusher Design For most applications, 6:1 is the maximum practical reduction factor (ratio) for a cone crusher, but 5:1 represents better design practice.  Source: Jack de la Vergne
25.14 Crusher Design Corrugated liner plates designed for jaw crushers (to avoid a slabby product) result in shortening liner life by up to two-thirds and they are more prone to plugging than smooth jaws.  Source: Ron Doyle
25.15 Crusher Installation The crushed ore surge pocket beneath a gyratory crusher should have a live load capacity equal to 20 minutes of crusher capacity or the capacity of two pit trucks.  Various Sources
25.16 Crusher Installation It will take six months to excavate, install, and commission an underground crusher station for a typical jaw crusher.  For a very large jaw crusher or a gyratory crusher, it can take nine months.  Source: Jim Redpath
25.17 Crusher Installation The desired grizzly opening for an underground jaw crusher is equal to 80% of the gape of the crusher.  Source: Jack de la Vergne
25.18 Crusher Installation The maximum feed size for a jaw crusher should be about 85% of the gape.  Source: Arthur Taggart
25.19 Crusher Installation The combination of a jaw crusher and a scalping grizzly will have 15% more capacity than a stand-alone jaw crusher.  Source: Ron Casson
25.20 Crusher Installation As a rule, scalping grizzlies are rarely used anymore for (large) primary crushers.  The exception is when ore contains wet fines that can cause acute packing in a gyratory crusher.  Source: McQuiston and Shoemaker
25.21 Crusher Installation The product from a jaw crusher will tend to be less slabby and more even-dimensioned without a scalping grizzly, since slabs do not pass through so readily under this circumstance.  Source: A. L. Engels
25.22 Crusher Installation Removal of the scalping grizzly for a primary jaw crusher can cut the liner life by 50%.  It also makes it more difficult to clear a jam when the jaws are filled with fines.  Source: Ron Doyle
25.23 Crusher Costs The total cost of a jaw crusher installation underground may exceed six times the cost of the crusher itself (purchased new), while on surface the factor is usually between three and four.  Source: P. White and H. Lang
25.24 Crusher Costs With a typical 6:1 reduction ratio, the power consumption of a large jaw crusher (48 by 60) is approximately 1.8 tons per horsepower-hour (2.2 t/kWh).  Source: Arthur Taggart
25.25 Crusher Costs The power consumption of a 42-inch gyratory crusher is approximately 2.4 tons per horsepower-hour (2.9 t/kWh).  Source: Arthur Taggart
25.26 Crusher Costs Power consumption of a jaw crusher when idling is about 50% of full load, for a gyratory it is approximately 30%.  Source: Richard Taggart
25.27 Rockbreakers The capacity of a hydraulic rockbreaker is higher (and the operating cost lower) than a pneumatic rockbreaker.  For these reasons, most new installations are hydraulic, despite the higher capital cost.  Source: John Kelly
25.28 Rockbreakers For underground production rates less than 2,000 tpd, it may be economical to size the ore underground with rockbreakers only, otherwise, an underground crusher is usually necessary when skip hoisting is employed.  Source: John Gilbert
25.29 Rockbreakers The operating cost for a stand-alone rockbreaker will be approximately 30% higher than it is for a crusher handling the same daily tonnage.  Source: John Gilbert
25.30 Rockbreakers The capacity of one rockbreaker on a grizzly with the standard opening (± 16 by 18 inches) is in the order of 1,500-2,000 tpd.  Source: John Gilbert
25.31 Rockbreakers For skips that fit into a standard 6 by 6 shaft compartment, the maximum particle size that is normally desired for skip hoisting is obtained when run-of-mine muck has been passed through a grizzly with a 16-18 inch opening.  Skips hoisted in narrow shaft compartments may require a 12-14 inch spacing, while oversize skips may handle muck that has passed a 24-30 inch spacing.  Source: Jack de la Vergne
25.32 Rockbreakers A pedestal-mounted rockbreaker installed should be equipped with a boom that enables a reach of 20 feet (6m).  Source: Peter van Schaayk
 
 Print